Scope
Left-hand boom section, from the lower connections to the upper assembly.
ANONYMISED FIELD CASE • 8 OCTOBER 2026
This anonymised field case is based on real inspection material. The footage was reviewed from the lower connections to the upper assembly, with each selected frame linked to a checked point, source timestamp and visibility limit.
ANNOTATED FILM
The film uses 4K source frames. Close-ups do not exceed the source resolution. Every sequence includes a timestamp and visibility status.
34 seconds • Full HD • seven sequential views • no client or location data
SCOPE AND METHOD
Left-hand boom section, from the lower connections to the upper assembly.
Presence of a visible retaining element on the shown end of each pin.
4K footage, 3840 × 2160 px, 29.97 fps, duration 2 min 39.69 s.
Right-hand side, concealed areas, clearance, wear and compliance with the manufacturer's instructions.
EVIDENCE FRAMES
These are representative frames selected from the footage. Their number is not the total number of pins in the structure.

Retaining element visible

Retaining element visible

Retaining element visible

Retaining element visible

Retaining element visible

Retaining element visible

Partial view. Additional close-up required
CONCLUSION AND LIMITATIONS
Retaining elements were recognised on the clearly visible ends of the checked pins. The footage does not show every surface, the opposite side of the connections or concealed elements. It therefore does not confirm the completeness of every pin in the crane.
This is visual documentation, not a statutory inspection report, technical acceptance or certificate of safe operation. It does not assess cracks, deformation, corrosion, clearance, wear or installation compliance with the manufacturer's instructions.