FROM OBJECTIVE TO OFFER

Documentation for PV owners and operators

Give your maintenance team documentation that helps locate areas requiring checks. We link the imagery to the installation context and organise it within the agreed scope.

Demonstration RGB and thermal drone inspection of a solar farm

Project plan

Scope and price are confirmed before commissioning. The offer lists exactly what the selected package includes.

Select areas for checking

Systematic thermal and RGB capture can document unusual temperature patterns. These observations guide follow-up checks. They are not an electrical diagnosis.

Locate each observation

Contextual views and an available module-layout plan help link images to the site. We agree the referencing method before capture.

Share the material with the maintenance team

Post-installation review, maintenance planning and follow-up capture need different scopes. Documentation is selected to suit your objective.

What you receive

  • Thermal imagery with RGB context under suitable conditions.
  • An observation register referenced to areas or modules by the agreed method.
  • Organised files and overview imagery for the maintenance team.
Energy infrastructure documented from the air5 pages

DOCUMENT FOR THIS SERVICE

Energy Project Partner Brief

Three paid pilot scopes covering one turbine, a defined PV block and a construction stage, with a practical brief for the first project discussion.

One relevant document, without an unnecessary attachment bundle.

Four details for a quote

  1. Location and type: rooftop or ground-mounted?
  2. Capacity in kWp or MWp and availability of a module-layout plan.
  3. Objective: post-installation review, maintenance or follow-up?
  4. Timing, operating state and access conditions.

Preparing or sending an enquiry does not book a flight or commission the work.

Before sending your enquiry

Will you identify the cause of reduced production?

Imagery may reveal anomalies requiring checks. Establishing the cause and an electrical diagnosis requires appropriate specialist verification.

Do you cover rooftop and ground-mounted installations?

Yes, following a review of location, safety, operating conditions and feasibility.

Can our maintenance contractor use the documentation?

Yes. We agree how observations will reference the installation and what documentation format is needed before capture.

SZCZECIN BASE, POLAND AND SELECTED EUROPEAN MARKETS

Define the scope for your site

Enter the project location and objective. We agree feasibility, outputs, timing and price before confirming the work.

What happens after you send the brief

  1. We check whether the information is complete and the work is feasible
  2. We ask only for details that are still missing
  3. You receive a proposed scope and individual quote

Prefer to speak before sending the brief?

Operational base: Szczecin, Poland. Projects in Poland, Germany, Spain and selected European countries are confirmed after reviewing site access, local regulations, airspace, permits, safety, weather and logistics.

QUICK QUOTATION

Get a quick project quotation

Share the location, what you need and your contact details. We can clarify everything else later.

Ready to send0/5
Add timing, phone, files or project details optional

Additional details for an individual quote

The additional scope described below is not included in the calculator's base package amount. Feasibility and costs require individual confirmation.

Location, files and preferred next step

Add a map link or coordinates, choose the preferred next step and attach material that helps us assess the project.

You will receive a case reference immediately.

Your data is used only to handle this enquiry. Do not enter sensitive information.